 鲜花( 30)  鸡蛋( 0)
|
本帖最后由 爱城一粒沙子 于 2015-7-29 16:33 编辑
4 i( K- ~; m, P% K5 g
2 {, Y9 W: _$ A( r5 g; \$ sJourneyman Electrician2 ~! H! j+ H; u6 Y9 ?
Total Number of Positions: 20 Positions Filled: 16 High Number: 103939 TRAVELER-2( t% R, C0 d1 q" b9 o
Contractor: Norcan Electric+ @# g0 u3 s( S
Location: Syncrude Maintenace (Base Plant)
+ X) J: ]" Z- ?; uDescription:
) n4 @. Y6 o) V3 N* zDay shift, Start ASAP, 1 Week plus, 4/10's (May change to 10/4), Report after callout, Orientation to be confirmed, Working under the Maintenance Agreement, No beards, Own transportation, Camp provided if no residents, Industrial rate.1 U& p5 k/ S' A3 e
Pre-Requisites / Conditions: Pre-Access D&A (Active RSAP Site), CSTS, Heavy Lifting, Bending, Pulling, Climbing, Working at Heights, Must Have 2 Way Radio Communication Experience, Confined Space/Fall Protection/Mask Fit/H2S Alive/ First Aid/AWP & EHT Experience Preferred.
6 M2 l# e8 [& t/ u1 bOpen Date: 07/22/2015$ }" H7 h A7 @ Q" {
Close Date: 08/31/2015
$ q j$ n' P% l) W8 u- x- o, I1 cJob #: 441 |
|