一共就两次walk through,第一次就说了railing有问题, 然后就是最后一次walk through,发现完全没看图纸 ... " o: }: e2 q+ S/ o# P3 g
Did you ever follow up with the builder?
& o/ P5 P! ^, ` S8 ?. cI would tell the site superintendent to arrange another walk through once the problem is fixed but not drag it along until the final walk through./ m% D' i& o" L7 N! ~
It is too late to talk about this now. 0 \, F3 i; g5 ~; B2 c" T2 E
If you have everything documented, show it to the lawyer and ask for hold back.
* p8 B) H, I ~' }* F" A
: m1 l! Y' d, @" DIf you can live with the wall, ask the builder to compensate you instead of removing the wall.7 }- Y2 B+ S' e9 `* e
It will be messy after you move in and they come back to take down the wall. |
|